Useful Structures. Fully relocatable structures, off site construction, adaptable buildings.
/ HOME / ABOUT US / NEWS / TESTIMONIALS / BROCHURES / QUOTE / GALLERY / CONTACT US /   Search the website.
/ Sales and Marketing Suites
/ Warehousing and Logistics
/ Sports & Leisure Facilities
/ Waste Management
/ Education Facilities
/ Office Space
/ Larger Structures
/ Bespoke Solutions
/
/
/ Case Study 2
/
/
/ Offsite Construction Pods

Case Study 2

The Eden Project Ice Rink Canopy


Project Objectives
To design and build a relocatable structure, for winter use only, as an ice skating rink.

Challenges
The structure had an overall lead time of 8 weeks from order with an on-site build time of just 10 days.

The Solution
The iconic architecture of Tim Smits’ Eden Project demands a visually exciting solution for any ancillary structure and this innovative ice rink canopy is no exception!

Covering an area in excess of 2000 sq metres (approx 21,200 sq feet), a steel-framed building with a 900g/sq metre heavy duty membrane roof was constructed.

The Result
Due to its popularity and versatility, the engineering of the original winter ice rink has now been revisited to create a permanent solution which can also host year round events, exhibitions and summer shows, including a spectacular proscenium arch.


/ ©2008 Useful Structures Ltd. All Rights Reserved. / Bookmark This Site / / Privacy policy /   Website Design By Zarr